Description: The project required redesign of the existing street approaches as well as drainage at the intersection. Special consideration for this project included the ability for fire truck to maneuver through the intersection, slow traffic entering the intersection, and provide access for large moving vans. The traffic circle was design with concrete paving, rolled curb, a 2-foot planting wall and diverter islands.
4TH Street Traffic Circle: Preliminary Engineering Construction Cost: $115,000 Completion Date: