4th Street and Central Ave Traffic Circle
News Current Projects Completed Projects Jobs at WGZE Staff

                                                                                        This site is under construction

Description:

The project required redesign of the existing street approaches as well as drainage at the intersection. Special consideration for this project included the ability for fire truck to maneuver through the intersection, slow traffic entering the intersection, and provide access for large moving vans. The traffic circle was design with concrete paving, rolled curb, a 2-foot planting wall and diverter islands.

 

4TH Street Traffic Circle: 

Preliminary Engineering

Construction Cost: $115,000

Completion Date:   8/1999

Agency:            City of Seal Beach

Contact Person:            Doug Dancs, P.E.

 